Breaking News

Osun begins Interview for shortlisted Teachers across the State | Governor Adeleke Tasks State Officials on Governance Delivery, Says No Room for Distractions. | Governor Adeleke Flags off Construction of Roads, Bridge in Obokun Local Government. | ALLEGED STAFF AUDIT FRAUD IS AN APC SPONSORED FAKE NEWS – OSUN GOVT. | Governor Adeleke Reviews Tech Sector Progress, Says His Government Is a Trail blazer. | Governor Adeleke Reduces Public Servants Work Hours for Ramadan and Lent Period. | Osun Government Clarifies Position On Local Government Salaries | Resist Election Riggers; Collect their Money; Vote Against Them – Governor Adeleke Charges Osun Electorates | RAMADAN: LET US RENEW OUR COMMITMENT TO A JUST SOCIETY, GOVERNOR ADELEKE TASKS OSUN PEOPLE | Governor Adeleke Hosts Canadian Delegation, Drums Support for Nigerian – Canadian Subnational Economic Initiatives. | Osun govt uncovers sinister planned protest by APC to cause mayhem over PBAT’s visit tomorrow. | Face Your Ministerial Failure or We Unearth Sordid Performance as a Governor and Minister – Adeleke’s Aide Replies Oyetola’s Media Assistant | Face Your Ministerial Failure or We Unearth Sordid Performance as a Governor and Minister – Adeleke’s Aide Replies Oyetola’s Media Assistant. | Adeleke’s Spokesperson Slams APC, Says Infra Projects are Inclusive and Evenly Spread. | Adeleke: Osun Open for Mining Business with Ease of Doing Business and Security. | GOVERNOR ADELEKE CELEBRATES HON. (DR.) MARUF ADEWALE ADEBAYO GANGARIA ON BIRTHDAY. | GOVERNOR ADELEKE HAILS ORANGUN OF ILA ON HIS BIRTHDAY. | Osun APC is scared of its own shadows -Adeleke Spokesperson | Calls for State of Emergency: Failed Desperate Act of Oyetola and Oyebamiji — Governor Adeleke | Osun holds another stewardship programme tomorrow. | Governor Adeleke to Police: Unseal Amotekun to Contain Banditry, Kidnapping
osun airport
Webmaster January 25, 2016

Osun Airport 25 per cent complete – Consultant

Against the background of opposition’s criticisms of the MKO Abiola International Airport, Ido Osun in Osun, the Consultant Engineer to the state ‎government on the project, Wemimo Adebajo, has revealed that the airport when completed will rank among airports with the longest runways in Nigeria.
 
osun airport
 
Mr. Adebajo, during an inspection tour of facilities at the airport with journalists stated that the present site of the MKO Abiola International Airport was the first place where aviation activities took place in West Africa.
The consultant, speaking on the percentage of work done at the airport, noted that government, having spent N2.7 billion out of the revised total cost of N11billion for the project, work could be said to have reached 25 per cent.
He added that the West African Frontier Force was lifted from the Ido-Osun aerodrome, the present site of the MKO international Airport project during World War II, hence the conscious effort by the state to make it the best in Nigeria if not in Africa.
He told journalists that the tour of the facilities became germane to allow journalists be adequately informed about the magnitude of the work done in order to situate the criticisms of the opposition in their proper context.
According to the consultant, the runway of the airport waiting to be laid with 500 mm asphalt is 3.5 kilometre in length, 12.3 metres excavation and re-filling with laterite. He added that both sides of the runway are equipped ab initio with water pipes which will be the first of its kind in Nigeria.
He explained that with such a feature, the airport will have been equipped with facilities that will make emergency fire fighting readily available near the runway in case of any emergency landing or fire outbreaks.

He pointed out that though the runway has not been completed, but in case of an emergency, the runway at its present state can be used by any pilot to land an aircraft at the MKO International Airport.
“Still more to be done, I believe the airport is good for the state. The main delay right now is a question of funding and the state is seeking ways on how to make it available.
“We are approaching the federal government for 50 per cent of cost of building the airport which is Federal Government policy, right now. What the contractor is doing is site maintenance so as to ensure that when work resumes there won’t be any case of deterioration of the huge work that had already been done here,” the Airport Consultant stressed.
Mr. Adebajo also added that the Control Tower nearing completion is at the third floor of four sitting on a foundation of an excavated ground of nine metres.
He said, “A lot of work has been done, and as we go round, you will see the control tower which we have built and it is almost completed. You will see the terminal building built to the foundation, the airport fire station has reached the stage of roofing.
“The runway is going to take about 60 per cent of the cost of any airport project. A lot of work has been done on the runway, there are about 8 streams in the path of the runway. It therefore became necessary to excavate and build box covets so that the water in the stream will flow unhindered under the runway.”
He explained that the essence of the facility tour of the airport with journalists was to allow people know what the state is doing at the airport and not just respond to allegations.
“I think the State government is trying to make sure that the press, the people of the state and Nigeria as a whole are briefed on what they have actually been doing. If it was just to respond to some political allegations, you will be talking to a politician, not a technocrat like myself.
“I have actually read in the newspaper that the contract has been inflated to 15.5billion Naira which is not true, I have just told you it is 11billion Naira and if you compare this with every others in Nigeria, you will realise that the cost of this one is cheap”.
The Consultant Engineer confirmed to journalists that the airport project predated the Rauf Aregbesola administration stating that the project had since 2010 been reviewed to over N7.5 billion even before the coming of the Aregbesola administration.
In an earlier statement issued by the state government, the Director, Bureau of Communication and Strategy, Semiu Okanlawon, had debunked insinuation of contract inflation, saying considering exchange rate factors, and the fact that the scope of the project was reviewed to make the airport more sophisticated than earlier projected, allegation of inflation was mischievous and misplaced.

Leave a Reply

Your email address will not be published. Required fields are marked *